Juling Instrument Manufacturing Co., Ltd.
  Email:Jerry@jlmeter.com

Heat Meter

Multi Jet Mechanical Common Heat Meter

  • Shelf time:2018-04-13 15:49
  • Transmission Mode:Mbus /RS485 Nominal Caliber :15 /20 /25 /32 Product Parameters Nominal Caliber I L L1 B d H Connecting Thread mm D 15 204 110 1.6 69.4 48.1 G3/4B R1/2 20 234 130 1.6 69.4 48.1 G1B R3/4 25 250 130 1.6 69.4 51.1 G1-1/4B
  • Inquiry
Transmission Mode:Mbus /RS485
Nominal Caliber :15  /20  /25  /32

Product Parameters


Nominal Caliber I L L1 Bd H Connecting Thread
mm D  
15 204 110 1.6 69.4 48.1 G3/4B R1/2
20 234 130 1.6 69.4 48.1 G1B R3/4
25 250 130 1.6 69.4 51.1 G1-1/4B R1
 

Nominal Caliber(DN)mm 15 20 25 32
Flow Meter Max. Flow QS(M3/h) 3 5 7 12
Permanent Flow QN(M3/h) 1.5 2.5 3.5 6
Min. Flow QI(M3/h) 0.03 0.05 0.07 0.12
The Way of Work WIEGAND or Inductor non magnetic signal acquisition
 
Maximum Use Temperature 95℃
Maximum Working Pressure 1.6MPa
Pressure Loss <0.025 MPa
Accuracy Class 2     3
Temperature Sensor Sensor Type Pt1000
Range of Temperature Measurement 0~150℃
Wire Length 1.5m(Customizable)
Integral Calculator
 
Range of Temperature Measurement 0~150℃
Maximum Temperature Difference 90℃
Minimum Temperature Difference 3℃
Temperature Resolution 0.01℃
Others Working environment temperature +5℃~55℃ A
Power service life ≥6 Years
Installation position Inlet pipe or Backwater pipe
Installation method Horizontally or Vertically
Protection grade IP54

Main functional characteristics

1.    Non magnetic flow meter without magnetic interference.
2.    High sensitivity, Perfect data storage, Long life of lithium battery.
3.    The controller can rotate freely, so as to observe the readings conveniently.
4.    Complete data display, Guarantee the accuracy of measurement.
5.    Small pressure loss, strong anti-theft ability.
 
 Installation notes and Instructions:
1. Before installation, the pipes should be cleaned up firstly in case of pipes block which will influence normal working of heat meter. And we suggest that it will be better to install filter device in front of the heat meter.
 
2. Heat meter should be installed at the place of water outlet of the pipe, to avoid pollution, and make it easy for dismantling and check.
 
3. Heat meter should be installed horizontally (with the side of display upward), the direction of arrow should be the same with that of the water flow direction in the pipe.
 
4. The inlet temperature sensor (line with red label) should be installed on the joint of the water entrance, and the outlet temperature sensor (line with blue label) should be installed on the joint of the water exit.
 
5. Don’t use excessive force when connecting meter and pipe in order to avoid crushing sealed washer and cause water leaking.
 
6. Handle with care when delivery and avoid store the meters in strong magnetic field.

NEWS

CONTACT US

Juling Instrument Manufacturing Co., Ltd.

QQ:1848437619

TELPHONE:+86 15530343385

E-MAIL:Jerry@jlmeter.com

ADD:XuJiaZhuang Industrial Park QiaoXi District ZhangJiaKou China

Scan the qr codeClose
the qr code